株式会社伊藤鐵工所 ルーツブロワ株式会社伊藤鐵工所 ルーツブロワ株式会社伊藤鐵工所 ルーツブロワ

English

Rotary Blower
Achievements

Experience breaking out of Japan and spanning the world

Case Study

Rotary Blower
Applications

Case Studies of Blowers in the Pressure and Vacuum Applications

Blower Application Examples
  • Reservoir and Water Purification Plant Blowers
  • Water Park and Aquaculture Aeration Blowers
  • Flue Gas Desulphurization Blowers of Coal Fired Power Plant
  • Aeration Blowers for Incinerators and Burners
  • Food, Chemical, Composite Resin Pneumatic Conveying
Vacuum Pump Applications
  • City Waste Disposal Equipment
  • Fresh Food Products Vacuum Wrapping Vacuum Pump
  • Fibers, Papers, Printing Factory Dehumidification Pumps
  • Beer & Cooled Beverage
  • Aeration/Oxidation Blower for Ozone Generator Equipment
Blower Application

Employment Information

ITO creates professionals capable of global work

Employment Site

鼓风机业绩

不仅在日本国内,业绩也遍布世界各地

工程案例

鼓风机用途

出口增压为鼓风机,入口吸附负压为真空泵

鼓风机用途案例
  • 储水厂净水厂的水处理设施
  • 水族馆养殖场的空气补给
  • 火力发电厂的烟气脱硫装置
  • 燃烧炉,各种炉子空气补给
  • 食品,药品,合成树脂等空气输送用
真空泵应用案例
  • 都市的垃圾回收装置
  • 生鲜食品的真空包装
  • 纤维,造纸,印刷工厂的加脱湿装置
  • 啤酒,清凉饮料的碳酸气制造装置
  • 臭氧发生装置的空气,氧气供给
鼓风机用途

招聘信息

可以走遍世界各地的专业ITO人员

招聘信息
トップページ > English > サービス一覧_en

Lists of Maintenance Services

NamesContains
Purchasing Spare PartsAvaliable to respond swiftly from quotation to delievery, if blower's type, working number is indicated.
Esablishing Maintenance Plan
Providing construction advices which focus on "Machine's Lifespan", "Avoiding Malfunction ", "Minimaizing Maintenance Cost" 3 points, based on the analysis of overhauling.
Maintenance (Overhauling)Refer to another sheet (Standard Overhauling Operation Description)
Simple InspectionRefer to another sheet (Standard Overhauling Operation Description)
Respond to emergency malfunctionEngineers will be dispatched from each office to respond emergency situations.
Dispatching SupervisorAlthough the operation will be following the 3rd guidance on contents, because the operation is not conducter by our engineers, it is not covered under warranty.




Standard Overhauling Operation Description

Services UnitContains Special Notes
1.Before Operation・Confirmation of operation
 1-1Carry in materials and tools・Carry in materials and tools to appointed place
・Arrange and reset operatopn place

  1-2Preparetion before Operation


・Curing the operation place as needed 
・Confirm the target equipment
・Cut the power・Require clients to switch
・Switch off the connected valve・Require clients to switch
 2.Maintenance・Make overhauling, cleaning, spare parts replacement, assembling, commissioning report ・Take out discharged oil by wasted oil can

 2-1Disassembling
・Remove V belt cover
・Remove V belt・We will have a separate consultation in the case that gears, bearing holders deteriorated or were burned and cannot be remove, 
・Discharge oil (Pully's side, Gear's side )
・Remove pully
・Disassemble blower (Oil Case, Side Cover, Bearing Holder, Rotor, Inner of Casing, etc. )
 2-2Cleaning
・Cleaning reusing sapre parts
(Oil Case, Side Cover, Bearing Holder, Rotor, Inner of Casing, etc.)
・Take out discharged oil by wasted oil can
 2-3Rust-proofed inner coating
・SUS coating on gas connecting parts
・It may be without coating based on blower's specification.
 2-4Measurement
・Visual Inspection (Inner of Casing,  Surface of Rotor, Contact Surface of Timing Gear, etc.)
 
・Fitting Part of Rotor Shaft Bearing , Contact Surface of Oil Seal
・Measure by micrometer
 2-5Assembling
・Assemble rotor, Replace parts, side cover, Assemble oil case
 
・Clearance Adjustment
 
・Remove pully and belt (Tension adjustment)
 
・Remove belt cover
 
・Oil injection
 
3.Accessories Inspection
・Suction Silencer, Filters, Safety Valve, Preesure Gauge, etc.
・Check abnormalities by visual observation
4.Commissioning
・Generally commission 1 hour
 
 4-1Bearing Temperature
・Measure 4 times  every 15 minutes to confirm that there is no abnormality.
 
 4-2Vibration Level・Check there is no abnormal vibration after operation, and measure the vibration level 1 hour later.
 
 4-3Noise Level・Confirm there is no abnormal sound.
 
 4-4Oil leakage・Check there is no leakage from shaft through parts and each connection parts.
 
5.After operation
・Report the completion of the operation to the client
 
 5-1Clean up・Clean up and cure the operation place
 
 5-2Move out materials and tools ・Move out materials and tools from appointed place 
6.Report
 ・Generally submit in 2 weeks after the operation completed. 
 6-1Maintenance Photos
・Generally submit maintenance photos as following
(1)Before operation (2)Overhauling (3)Cleaning (4)Replace Parts(new・old)
(5)Assembling (6)Assembling Completedly (7)Commission (8)Completion
 
7.Warranty
・There is  1-year warranty according to ITO's regulation.
 



Simple Inspection

Services UnitContainsSpecial Notes
1.Before Operation・Confirmation of operation

 1-1Carry in materials and tools・Carry in materials and tools from appointed place
・Arrange and reset operatopn place

 1-2Preparetion before Operation


・Curing the operation place as needed
・Confirm the target equipment
・Cut the power・Require clients to switch
・Switch off the connected valve・Require clients to switch
2.Simple Inspection Operation
・Internal visual inspection, Oil, V belt replacement
 
 2-1Internal visual inspection・Confirm the inside situation from suction port by sight.
 
・Clearance Confirmation
 
 2-1Check oil and belt・Remove side cover 
・Remove V belt
 
・Discharge oil (Pully's side, Gear's side )
 
・Replace belt, oil 
3.Check accessories
・Suction Silencer, Filters, Safety Valve, Preesure Gauge, etc.
・Check abnormalities by visual observation
4.Commissioning
・Generally commission 1 hour
 
 4-1Bearing Temperature・Measure 4 times  every 15 minutes to confirm that there is no abnormality.
 
 4-2Vibration Level・Check there is no abnormal vibration after operation, and measure the vibration level 1 hour later.
 
 4-3Noise Level・Confirm there is no abnormal sound.
 
 4-4Oil leakage・Check there is no leakage from shaft through parts and each connection parts.
 
5.After operation
・Report the completion of the operation to the client
 
 5-1Clean up・Clean up and cure the operation place
 
 5-2Move out materials and tools・Move out materials and tools from appointed place 
6.Report・Generally submit in 2 weeks after the operation completed.
 
7.Warranty
・Because expendable parts are not replaced, it is not covered under warranty. 
 